Contracts

Aspen Construction Company has a long history of completing projects on time and within budget for many facets of the Government and State managed entities.

For general information regarding our Government Projects Division, please contact us

 

 

 PROJECT TITLE  LOCATION  AFFILIATE  DESCRIPTION  YEAR
Clear Zone Drainage Project Langley Air Force Base, Virginia United States Air Force Over 16,000ft of new RCP storm draims and structures. 80 acres of excavation and grading for new drainage design. 2019
Sandy Lake Upgrades Sandy Lake, MN USACE New water main installation, remove and replace old underground tanks. 2019
Lake Winnibigoshish RipRap Repair Lake Winnibigoshish, MN USACE Riprap repair over eroded banks. 2019
WHA School Renovations Walker, Minnesota City of Walker, MN Installation of retaining walls, storm drains, soil corrections and pavement. 2019
Shingobee Turn Lanes Walker, Minnesota Cass County, MN Installation of new turn lanes on State Hwy 371 2019
Fort Leavenworth Road Repairs Fort Leavenworth, LS USACE Roadways construction including asphalt and concrete demo, RCP culvert installation with multiple associated structures, aggregate base grading, curb & gutter installation and asphalt paving. 2018
Cass County Highway Projects Walker, Minnesota Cass County, MN Install new centerline culverts, excavate new ditch grade, soil corrections, mill and overlay on county roads 39, 61, 38. 2018
Voyageurs National Park Rehabilitation Rainy Lake, Minnestoa Eastern Federal Highway Administration Roadway excavation, drainage piping installation, full depth asphalt reclamation with concrete stablization. 2018
Federal Dam Boat Launch Install Federal Dam, Minnesota USACE Removal and Installation of new concrete boat launch ramps. 2018
Steam Bank Protection Ridgeway, PA USACE 1,500ft of riprap protection on eroded river banks. Bridge foundation concrete repair. 2018
Bemidji Bride Demo Bemidji, Minnesota City of Bemidji, Minnesota Remove and dispose of old existing railroad bridge between Lake Irving & Lake Bemidji. 2017
Federal Dam Repair Federal Dam, Minnesota USACE Install culvert for new road off top of dam. Install new road. Regrade existing slopes. 2017
Worthington Streambank Protection
Worthington, WV USACE 1,400ft of riprap on river embankment 2017
Big South Fork ESA Compliance Stearns, KY USACE Excavation of old mining spoils and covered with riprap to protect river embankment. 2017
Northland School Remer, MN Cass County, MN Demolition of old school & excavation and grading for new school addition. 2017
Tamarac NWR Detroit Lakes, MN Eastern Federal Highway Administration Road Widening, Excavation, Culvert Installs, Retaining Walls 2016
10" Water Main Repair-S Annex Charleston, South Carolina Joint Base Charleston Installation of a 10" force water main on the side of a bridge. 2016
Scott Air Force Base Taxiway Demolition Scott Air Force Base, Illinois Scott Air Force Base 2016
Culvert Repairs - Gates 53 & 65 Charleston, South Carolina Joint Base Charleston 2016
Lake Bemidji South Shore Repair Bemidji, Minnesota City of Bemidji, Minnesota Removal of over 9,500 yards of debris and install 9,000 yards of sand for Lake Bemidji beach 2016
Bristol 8th Street Improvements Bristol, Tennessee USACE 2016
Leech Lake Elder Care Center Cass Lake, Minnesota Excavate for new building foundation & backfill. Install courtyard storm sewer drainage area. Grading for pavement and sidewalks. 2016
Cass Lake Hospital Cass Lake, Minnesota Site work & Utilites for Hospital addition. Expand for new parking lot. Site landscaping. 2015
Wolf Creek Dam - Site Stabilization Wolf Creek, Kentucky USACE 2015
Gavins Point Pond Stabalization Gavins Point, South Dakota US Fish & Wildlife Service Excavation, grading and lining of fishery ponds. 2015
Mille Lacs County CSAH 4 Mille Lacs County, Minnesota Mille Lacs County Highway Department 4 miles of road shoulder widening & reconstruction. 2014
Gavins Point Dam - Bank Stabilization Gavins Point, South Dakota USACE 2014
St. Cloud VA Health Care Center St. Cloud VA, Minnesota Department of Veteran Affairs 2014
Itasca County CSAH 5 Itasca County, Minnesota Itasca County Highway Department 2014
Zippel Bay Harbor Improvements Zippel Bay, Minnesota MNDNR 2014
NASA Langley Research Center Langley, Virginia USACE Sewer and water improvements. 2014
County Road 67 Grade Raise Cleveland & Gackle, North Dakota Stutsman County, North Dakota Raise existing road at water crossing. Place RipRap. CL Pipe. Topsoil. Seed & Repave 2013
North Dakota Hwy 1 Grade Raise Binford, North Dakota NDDOT Raise existing road at water crossing. Place RipRap. CL Pipe. Topsoil. Seed & Repave 2013
Underground Utility & Street Improvements 6th Street Walker, Minnesota City of Walker, Minnesota Street improvements including removing & replacing water & sewer main lines. Improve street scape. 2013
Kendall & Waitsboro Recreation Area Lake Cumberland, Kentucky Eastern Federal Highway Administration Rehabilitation and reconstruction of slide areas. Full depth patching repairs and shoulder work. 2013
Family Dollar
Cass Lake, Minnesota
Site Clearing, Excavation for new building. Installation of site utilites 2013
Ketterling's Point Shadehill Reservoir Lemmon, South Dakota Bureau of Reclamation Repair existing bank, Install 6,230cy RipRap shoreline protection & 10,000cy stock piles 2012
Flood Damage Reduction Bristol, Tennessee USACE Remove double 12x18x150' culvert. Shape banks. Install RipRap. Sidewalks. Plaza. Park benches etc 2012
Walkway Replacement Leech Lake Recreational Area Federal Dam, Minnesota USACE Replace existing wooden walkway with steel grating. Refabricate guardrail system. 2012
Emergency Steambank Protection Jamestown, North Dakota USACE Place and shape fill for bank. Install RipRap to protect stream bank. 2012
Hubbard County State Aid Highway 37 Hubbard County, Minnesota Hubbard County, Minnesota 4.7 Mile road reconstruction. Double 12'x6' box culvert installation. Intermittent culvert crossings. 2011
Trenton Dam Concrete & Steel Repair Trenton, Nebraska Bureau of Reclamation Repair existing deteriorated structural concrete. Add drain extensions. Repair eroded slope. 2011
Enders Dam Concrete & Steel Repair Enders, Nebraska Bureau of Reclamation Structural concrete repair. Drainage system repair 2011
South Bend Township Emergency Repair Mankato, Minnesota USACE Repair failed levee section. Repair/replace 24", 30", 48" & 54" RCP and precast structures. 2011
Sandy Lake Lift Station McGregor, Minnesota MNDNR Installation of new Holding Tank, Septic System & Lift Station 2010
Moreau Bank Stabilization Oahe Lake, South Dakota USACE Place and shape fill. Install geotextile fabric. Place 10,000 ton of 4,000 lb. RipRap on shoreline 2010
Pigeon River Fish Passage Chippewa National Forest US Forest Service Construct 250' of Fish Passage Channel 2010
Walker Ranger District Admin - Phase 1 Walker, Minnesota US Forest Service Demo 2 buildings. Move 2 buildings. Installation of utilities, retaining walls. Site Grading. 2010
Waubay NWR Shoreline Repair Waubay, South Dakota US Fish & Wildlife Service RipRap shoreline repair & installation 2010
Lock & Dam 5 Access Road Repairs Winona, Minnesota USACE Sheet piling. Deep excavation. Drainage systems. Curb & gutter. Paving. 2010
Leech Lake Water Access Site Cass Lake, Minnesota MNDNR Major overhaul of existing water access site. 2010
Leech Lake River Boat Access Federal Dam, Minnesota USACE Design & install new boat access 2009
Sandy Lake Beach Improvements Libby, Minnesota USACE Excavate lake sediment. Rebuild & expand existing beach. 2009
Crosslake Campground Electrical Upgrade Crosslake, Minnesota USACE Upgrade electrical service & expand existing beach. 2009
Wabasha Pit Mixed Material Windrow Removal Wabasha, Minnesota USACE Remove railroad ties, soil, & vegetation form windrows in old gravel pit 2009
Fountain City Service Base Building Demolition Fountain City, Wisconsin USACE Demolish buildings & recycle waste 2009
TH 71 Culvert Replacement Park Rapids, Minnesota MNDOT Divert water flow. Remove existing culvert. Install new 36" culvert. 2009
Mucky Creek Bridge Replacement Badoura, Minnesota MNDNR Divert flow of creek. Remove steel & timber bridge. Install new aluminum box culvert. 2009
Minnehaha Falls WPA Creek Minneapolis, Minnesota USACE Divert water flow. Install reinforce concrete footings & repair historic limestone walls. 2009
Caraway Road Bridge Emily, Minnesota Little Pine Township Divert water flow. Remove existing culvert. Install new 11' x 11' x 100' concrete box culvert. 2008
NW Sanitary Sewer Extension Remer, Minnesota City of Remer, Minnesota New lift station & HDPE force main. 2008
Public Access Parking Lot Federal Dam, Minnesota USACE R & R concrete boat ramp planks and construct new parking lot 2008
TH 94 Culvert Repair & Replacement Stearns County, Minnesota MNDOT Install multiple centerline & median culverts. Install culvert liners 2008
Tower Ave & 2nd Street Improvements / Site Utilities Walker, Minnesota City of Walker, Minnesota New water & sewer mains, connections, locations, fire hydrants, manholes & storm sewer systems. 2007
TH 65 Culvert Replacement McGregor, Minnesota MNDOT Install centerline & entrance culverts ranging from 18" to 36". 2007
TH 18 Turn Lanes & Centerline Culverts Garrison, Minnesota MNDOT Install centerline & approach culverts 2006
Norway Beach Cell 2, Liner Removal & Replacement Cass Lake, Minnesota US Forest Service Remove & replace leaking PVC sewer pond liner 2005
Norway Beach Lift Station Cass Lake, Minnesota US Forest Service Install new lift station, PVC sewer main & laterals 2005
Cass Lake Annex CG Waterline Replacement Cass Lake, Minnesota US Forest Service Install new wells, pumping stations, & water mains 2005
Sanitary Sewer Collection System East Gull Lake, Minnesota City of East Gull Lake, Minnesota 25,000 ft. of main line sewer. 14,000 ft. of service lines. 235 individual connections 2005
Bemidji High School Demolition Bemidji, Minnesota ISD #31 Demolish 460' x 65' three story building 2004
Sanitary Sewer Phase 2 Construction Federal Dam, Minnesota City of Federal Dam, Minnesota Install tanks, grinder stations, & sewer force mains 2003
Minisogama Road Reconstruction Pennington, Minnesota US Forest Service Construct improvements to 5 miles of forest service roads 2003
Stoney Point Road Reconstruction Walker, Minnesota US Forest Service Reconstruct 3 miles of roadway, pave, & sealcoat 2003
Knutson Dam Breakwater Cass Lake, Minnesota US Forest Service Install RipRap breakwater & channel restoration 2001
Walker Area Community Center Walker, Minnesota City of Walker, Minnesota Strip site topsoil. Regrade site. Excavate for footing & grading for floor slabs. Installation of site utilites. Excavate drainage pond for storm sewer. 2000
Come Visit Us

3798 State Hwy 371
Hackensack, MN 56452

Get Direction
Contact Aspen

Phone: 218-675-5808 

Email: info@aspen-construction.com

Open Hours

Mondat - Friday: 7.30 AM - 4.30 PM
Sunday: Closed :)